Tips & FAQ: St. George Marathon

Race-specific advice, answers to common questions, and fun facts about the St. George Marathon.

Race-Day Tips

Even splits are king

The flat course is built for consistent pacing. Start at your goal pace and resist the adrenaline-fueled temptation to go faster in the first half.

Nothing new on race day

Test everything in training: shoes, socks, nutrition, hydration. Race day is not the time for experiments.

Enjoy the moment

You've trained for months. Look around. Smile for the cameras. High-five the spectators. These are the moments you'll remember.

Fun Facts

1

The 2026 race was the 50th St. George Marathon, with a record-setting field of 10,000 runners across events.

2

The first race, in November 1977, was started by Sherm Miller of the St. George Parks and Recreation Department, who had run the Deseret News Marathon in Salt Lake City.

3

The men's course record is 2:13:56, set by Jake Heslington in 2025.

✨ What Makes This Race Special

A net-downhill point-to-point marathon that drops nearly 2,600 feet from the Pine Valley Mountains to downtown St. George.

❓ Frequently Asked Questions

How long is the St. George Marathon? ▼

The St. George Marathon is a Marathon covering 42.195km (26.2 miles) on a road surface.

What is the time limit? ▼

The official time limit is 6.25 hours.

How much does it cost? ▼

The entry fee is not confirmed here yet. Check the official registration page for the current price.

Is the St. George Marathon good for beginners? ▼

The course is rated as easy, making it suitable for first-timers, though it's not specifically marketed as beginner-focused.

When should I register? ▼

Registration dates and entry rules are not confirmed here yet. Check the official registration page.

What is the average finish time? ▼

We estimate the average finish time at ≈ 04:28 (estimate, not an official figure) (hours:minutes). The course is conducive to fast times.

Get Your Training Plan

Free, personalized for this race

Get alerts for St. George Marathon

Registration openings, date changes, sell-out warnings.